AVIX Resource Balance

An AviX suite module

Efficient Flow Optimization

In AviX Resource Balance the work operations are balanced between the different workstations and internally between the operators.

AviX Resource Balance has the capability of  handling multiple operators and can be used to analyze man-machine operations.

AviX visualizes (graphically and numerically) losses caused by an unbalanced workflow. 
The final outcome is reduced balancing losses and the possibility to print new work instructions.

contact us for an
online demonstration

Correct input

AviX Resource Balance uses the analyzes from AviX Method. Production lines can be simulated with all possible data to simplify the work with balancing in a fast and easy manner. Balance your production line with correct time data from AviX Method. The balancing work is conducted by using these times which are updated in all AviX modules in real time. This means that you will always have up-to-date data in your balancing analysis.

Smart variant management

Companies without a great number of variants (product options) are rare! Using AviX Resource Balance gives the possibility to use logic rules when working with multiple variants. This makes it easy to see how different variants (product options) will impact the workload on each workstation in the workflow. It also gives the possibility to see how different product mixes will affect the balance.

Maximum control

When you balance the workload in AviX Resource Balance you will have full control over operations, components and tools. When you move work tasks between workstations to even out the workload you will move all the data contained in the tasks. When new balancing proposals are created, information about the tasks to be performed, the associated work instructions as well as material and tools will be available, connected to the affected work station.

Areas of applications

  • Create standardized work instructions
  • Work with multiple variants simultaneously
  • See the impact on the balance of a production forecast
  • Identify and reduce internal balancing losses
  • Increasing line performance by smoothing the flow
  • Simulate new balance when designing new production lines
  • Planning of production for a new product/variant
  • Layout improvements on existing line
CUSTOMIZE AND EXTEND AVIX RESOURCE BALANCE WITH THESE SUBMODULES
Execution optimizer

Helps improving production line output by analyzing and optimizing build schedule/production programs.

AviX Execution Optimizer
Down stream connector

Makes it possible to send data to and from AviX to other production systems such as ERP systems, MES systems etc.

AviX Connector
Production planner

The standard times given can be used for improvement work, capacity calculations and as a basis of decisions.

Shop floor viewer

Makes it possible to show work instructions digitally though a web browser on a screen/monitor. You can use existing or create new data using AviX.

AviX Shop Floor Viewer

AviX Resource Balance Screenshots

Balancing by drag’n drop gives the user the possibility to follow the balancing improvements when moving around work tasks. After each balancing step you will see how this influences the productivity and efficiency of the line.

AviX Resource Balance is built to be used as a means of communication. The combination of real-time, graphics and colors make AviX Resource Balance to a visual tool for presentations of various balancing scenarios.

CONTACT US FOR AN ONLINE DEMONSTRATION
Listening Image

Want to know more about AviX?

You are always welcome to contact us. Send a message below and we will reply within 24 hours.

AVIX Square Inv LOGO
(mandatory)
(mandatory)